Project Description

The project is a direct award (negotiated) contract with Mountain West Precast. The scope of work is to modify, modularize, and re-install four each C-130 work stands, fall arrest systems, and fuel ventilation systems previously located in Building 680, Hill AFB, and place into service in building 225 . The project also required the contractor to design and fabricate various stand pieces and to update original design drawings to reflect current and as-built conditions.

  • $4,164,189
  • Design/Detail/Fabricate/Install
  • Work performed in a fully operational aircraft maintenance facility